Shri Vinayraoji Kore
(Savkar)
To develop the India right from the root, the Co-operative base is needed which will make the profit to pass to the root level people and each and every Indian should flourished, so the efforts are taken to pass all the incentives/schemes to each and every home of rural area, so that the very motto of uplifting the rural India will be achieved.

With the same views when Hon. Vinay Kore Saheb was Minister for Non Conventional Energy took initiative to develop the small Hydro Project on BOT, to overcome the power scarcity.

With the same aim and objective the Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Ltd., Warananagar (Warana Power Co-operative) was formed, it took up 6 SHP to generate 10.6 MW. The reason to enter into small Hydro Project with low capacity was the Social-Economical and infrastructure development in rural area and makes every Common Indian to be the part of Growth Story.